Order a connection power cut
Do you need to switch the power off or on temporarily or reconnect it? Typical situations include the demolition and subsequent reconnection of an old house, renovation work requiring a power outage and the replacement or relocation of a distribution board.
Ordering a cut-off
As a rule, the distribution system operator is responsible for disconnecting electricity at the distribution network feed point and installing the meters. The customer’s electrical contractor is responsible for other installation work carried out in the property.
Order a cut-off if you need a longer power cut and order reconnection when you want to use electricity again.
Order cut-offOrder reconnection
Power interruption
Order a power interruption if you need to disconnect and reconnect electricity on the same day or within 24 hours.
Please note that when connecting a new main distribution board, a metering request must also be submitted, completed by the customer’s electricity contractor.