Order a connection
When you want to connect a property located in the Helsinki region to the electricity network, you need to draw up a connection contract, whereby you agree in writing on the electricity distribution connection.
You can place an order for the electricity connection with the electronic form (in Finnish).
Please tell us your preferred start time for the electricity contract at least one month in advance.
Any changes must be agreed on at least two weeks before the agreed start time.
In principle, only one connection can be built on a single plot. Exceptions to this are plots that have been divided with a registered agreement to divide the possession between joint owners, or with a long-term tenant agreement.
Any electricity-generating equipment that may be installed in the property must be notified in accordance with the electricity contracting instructions.